Company Projects


NASR Consortium (Phase 12 South Pars)
Water research institute
O.I.E.C (RAMSHIR)
A.Z.A.A.N CONSORTIUM
MEAM TEAM – ASFALT TOUS CONSORTIUM
RAMSHIR C.T.C.
UNIGULF Co.
SEPAH MARINE CORPS
TABRIZ PETROCHEMICAL COMPLEX
SHAHID TAHERI STORE (N.I.G.C)
LORESTAN REFEIGERATION INDUSTRIES
NASR Consortium (Phase 12 South Pars) Back to Top

Iinsallation & commissioning of electrical & mechanical equipment


Activity list of contract:

  1. conduit piping
  2. Metal work and supporting
  3. Cabling with armord cable( 2*2.5 -2*1.5)
  4. Scaffolding
  5. wiring
  6. Cabling withPVC cable -Low size
  7. Buldings outlet socket system installation-LCS
  8. lighting panel installation -ELP
  9. F&G panel installation
  10. UPS installation for emegency power system
  11. NLP system equipment installation
  12. earth cabling
  13. lighting pole and socket installation
  14. IT system equipment installation
  15. F&G system equipment installation
  16. Heating and coling fancoil installation
  17. PA/GA equipment installation
  18. Outdoor lighting
  19. lader and cable tray installation
  20. ducting for HVAC system
  21. Piping for HVAC hot and cold water
  22. fire fighting piping
  23. heat isolation for HVAC duct
Water research institute Back to Top

procurement, installation, commissioning of rever over flow detecting system for Azar bayjan SEFID ROD


Activity list of contract:

  1. Introduction and equipment installation of 28weatherman station
  2. Introduction and equipment installation of 13 hydrometery station
  3. Introduction and equipment installation of 70 local alarm station
  4. Introduction and equipment installation of 2monitorin control center, procurement of rquired hard ware and software
O.I.E.C (RAMSHIR) Back to Top

Installation and Pre commissioning of electrical and instrument of Phase 9&10 (South Pars Economic Energy Zone) (Jan 2007 to Feb 2009)

This project includes all electrical and instrument works at Phase 9&10, area C.


Electrical works:

  1. Installation, test & oil treatment of 18 set power transformers.
  2. Installation, test & power on of 5 set dry transformers.
  3. Installation of 24 Cell MV panel, 349 feeder LV panel, 5 Cell UPS, 10 Cell NGR.
  4. Installation of 12 Rack Batteries.
  5. Installation of 293,000 meter Power and Control cables.
  6. Installation of 208 Pcs. LCS & Receptacles.
  7. Installation of 72 set HV termination.
  8. Installation of 5600 meter conduit.
  9. Installation of 31,000 meter Ladder & tray.
  10. Installation of 44,000 meter earth cables and accessories.
  11. Installation of 2211 Nos. fixtures and 49,000 meter lighting cables.
  12. Installation of 8300 meter cathodic cable, 16 Anode and 59 Nos. devices and other accessories.
  13. Installation of 6000 meter heat tracing cables.
  14. Installation of 36,000 meter fire alarm cables
  15. Fabrication and installation of 82,000 kg support for electrical part.

Instrument works:

  1. Installation of 74 Cell control panels in ITR.
  2. Installation of 225 Cell control panel for valves.
  3. Installation of 32,000 meter cable tray.
  4. Installation of 328,000 control cables.
  5. Installation of 414 Nos. junction boxes.
  6. Installation of 4600 meter air pipe and accessories.
  7. Calibration of 1005 set instrument devices.
  8. Fabrication and installation of 118,000 kg support for instrument part.
A.Z.A.A.N CONSORTIUM Back to Top

Installation of electrical and instrument of Offsite Lines of Petrochemical Zone ( Mobin Petrochemical Company) , South Pars Special Economic Zone (Assaluye), and Installation, testing, alignment and pre-commissioning of fire water pump stations. (Apr 2005 to Feb 2008)


Electrical works:

  1. Installation of 243 Cell Panel (MV , LV , AVR , 132 KV Protection panel, UPS AC & DC, NGR , Wall mounted , Load shedding , Diesel control panel)
  2. Fabrication and installation of 18 ton Support, 1750 Meter ladder,3450 meter conduit.
  3. Installation of 398 Nos. Street lighting pole with 530 Nos. luminaries and installation of 5 pump station substation building lighting.
  4. Installation of 58 Km Earthing Cables (1*240, 1*120, 1*95, 1*25) and earth accessories For offsite Pipe racks, lighting routs and main earth ring.
  5. Installation of 83 Km Power, Control & lighting Cables and accessories.
  6. Installation of 52 Km Fiber Optic Cables (for 132 KV protection) and accessories.
  7. Installation of 8 Km cathodic protection cables, 140 Pcs. Anodes, 4 set transformer rectifier and negative, positive. & test bond boxes.
  8. Installation of 32 Km Fire alarm cables, 150 Pcs. Fire alarm detectors and other devices.

Instrument works:

  1. Installation of 93 Cell Panel (DCS , ESD , Network fiber optic and Patch panels)
  2. Fabrication and installation of 9 ton Support, 5200 Meter tray, 900 meter conduit.
  3. Installation of 59 Km instrument cables, fiber optic and earthing cables and accessories for control systems.
  4. Calibration and installation of 199 set instrument devices (flow , pressure , level transmitter and gauges)

Mechanical works:

  1. Installation and alignment of 30 set 6 KV pumps, Diesel and jockey pumps in 3 Fire pump station.
MEAM TEAM – ASFALT TOUS CONSORTIUM Back to Top

Installation of Heavy Equipments, Furnaces and Pumps and Installation of Refractory of Incineration Petrochemical Zone ( Mobin Petrochemical Company) In South Pars Special Economic Zone (Assaluye), (Nov 2006 to Sep 2007)


  1. Installation of Heavy equipments , pumps , ducts , 896,000 kg
  2. Installation of all type of refractory material , 811,000 kg
  3. Fabrication and installation of metal Tanks , 94,000 kg
RAMSHIR C.T.C. Back to Top

Installation of electrical and instrument of 10Th Olefins ( Main Unit of Jam Petrochemical ) In South Pars Special Economic Zone (Asaluye), (April 2004 to January 2005.)


Electrical works:

  1. Installation of 126 Cell Panel (MV , LV , UPS , Capacitor Bank , NGR , Wall mounted)
  2. Installation of 6 set busduct LV.
  3. Fabrication and installation of 28 ton Support, 23,500 Meter ladder, 1800 meter conduit.
  4. Installation of 13 Km lighting cables.
  5. Installation of 439 Nos. Explosion proof lighting fixtures and 515 Nos. Lighting junction boxes.

Instrument works:

  1. Fabrication and installation of 10 ton Support, 2300 Meter tray.
UNIGULF Co. Back to Top

Erection, testing and commissioning of cathodic protection of Pipeline for C2 Recovery (Assaluye), (2003 to 2004)


SEPAH MARINE CORPS Back to Top

EPC (Engineering, procurement and construction of buildings, tanks, piping and other works of sepah marine corps station / JASK), (1997- 1999)


Civil works:

  1. Construction of concrete tank (for water storage) , Vol = 6000 m3
  2. Construction of concrete tank (for daily water storage) , Vol = 400 m3
  3. Construction of Pump station
  4. Construction of 6 Nos. Substation buildings.
  5. Construction of telecommunication room.

Mechanical works:

  1. Installation of 4000 meter Pipes for water network.
  2. Installation of 1600 meter Pipes for plumbing network.
  3. Installation of hydrants and fire fighting network.
  4. Installation of pumps at pump station.

Electrical works:

  1. Installation of panels (6 substation building and stores )
  2. Installation of building lighting (6 substation building and stores )
  3. Installation of 20 KV cables for main power of station.
  4. Installation of 12000 meter LV and lighting power cables for electrical power and area lighting network.
  5. Installation of telecommunication panels and cables in telecom room. And other electrical works.
TABRIZ PETROCHEMICAL COMPLEX Back to Top

With NAVROOD Co. Joint Venture (Erection, test and commissioning of substations and main laboratory), (1995- 1996)


Installation of all electrical devices for 4 set 20 KV Substation included:

  1. 10 Set transformers (2 , 4.2 , 7.5 MVA)
  2. 22 Cell MV panels.
  3. 43 Cell LV panels.
  4. 32 Cell Control panels. (Connection to ITR)

Installation of all electrical system for main Substations(1,2,3 & 4) , UTILITY buildings , Central Laboratory and N.D.T Laboratory included:

  1. Installation of building lighting system.
  2. Installation of building fire alarm system.
  3. Installation of earthing system.
  4. Installation of telecommunication system.
  5. Installation of cathodic protection system.

Installation of all instrument devices for Central Laboratory included:

  1. Installation of LAB devices.
  2. Installation of all tubes.

Installation of all mechanical system for Central Laboratory included:

  1. Installation of U/G piping.
  2. Installation of A/G piping.
  3. Installation of plumbing piping.
  4. Installation of 8000 meter pipes for production (for Central Laboratory)

Installation of all mechanical system for Other Building and Central Laboratory included:

  1. Installation of fire fighting piping and hydrants.
  2. Installation of CO2 piping and devices.
SHAHID TAHERI STORE (N.I.G.C) Back to Top

EPC (Engineering, procurement and construction of All electrical work / SAVEH ), (1994- 1995), 16 Months


Electrical works:

  1. Installation of 24 Cell 20 KV Panels
  2. Installation of 44 Cell LV Panels
  3. Installation of 64 Cell lighting Panels
  4. Installation of 20 Cell Fire alarm Panels
  5. Installation of 60 set HV termination and 60,000 Nos. wire show and cable show.
  6. Installation of 430 Nos. Street Lighting poles
  7. Installation of 610 Nos. Luminaries for street lighting poles.
  8. Installation of 30,000 meter Cable ladder and tray
  9. Installation of 600,000 meter power cables.
  10. Installation of 10,000 meter control cables.
  11. Installation of 40,000 meter communication cables.
  12. Installation of 53,000 meter conduit.
  13. Installation of 2600 Nos. Fluorescent 3*40 watt.
  14. Installation of 5300 Nos. HPS Industrial Luminaries 250 watt.
  15. Installation of 16 Cell wall mounted and 30 Cell HVAC panels.
  16. Installation of 60,000 meter wire and 400 Nos. JB for lighting system.

Civil works:

  1. Installation of 430 Nos. concrete foundation for lighting poles
  2. Installation of 40,000 meter sleeve and Road crossing with 7000 m3 concrete
  3. 43,000 m3 excavation, sand filling and installation of concrete tile for cable pulling
LORESTAN REFEIGERATION INDUSTRIES Back to Top

Erecting, testing and commissioning of electrical and mechanical systems.


Electrical works:

  1. Installation of 12 set transformers (2500 KVA)
  2. Installation of 73 Cell 20 KV Panels
  3. Installation of 64 Cell LV Panels
  4. Installation of 5 set capacitor banks (750 KVAR)
  5. Fabrication and installation of 70,000 kg support for electrical cables.
  6. Installation of 120,000 meter MV,LV and Control cables and other works of normal and emergency networks, lighting, central telephone, fire alarm, paging.

Mechanical works:

  1. Installation of 40,000 meter Piping for U/G and A/G Networks.
  2. Installation of 4300 kg Pumps
  3. Installation of 127,000 kg Boiling oil and water tanks.
  4. Installation of 24,000 kg other tanks.
  5. and other works of pump station and fire fighting networks.

back to top